Skip to content
SMH Gas Specialist is now part of L J Plumbing and Heating Services. Existing SMH customers remain fully supported. Find out more
L J Plumbing & Heating Services Ltd
Refurbished pupil washrooms at Farthinghoe Primary School

Education

Schools & Estates

Plumbing, heating and refurbishment works for schools and education estates.

From washroom and bathroom refurbishments to plumbing, heating and planned maintenance, L J Plumbing and Heating Services supports schools with programmed work, clear communication and dependable delivery.

  • Bathroom, toilet and washroom renovations
  • Plumbing and hot-water installations, upgrades and repairs
  • Heating installations, upgrades, servicing and fault-finding
  • Planned and reactive maintenance
  • Refurbishment works with coordinated trades
  • Programmes planned around holidays, term time and site access

Planning works across a school or education estate? Send the scope, programme and site requirements to the team.

Discuss planned works
Refurbished washbasins at Bishop Loveday Primary School
School washroom at Bishop Loveday Primary School
Assisted cubicle at Farthinghoe Primary School
Pupil washroom at Farthinghoe Primary School

For schools and estates

Information for site and facilities teams.

For schools, academy trusts and facilities teams, site-specific documentation can be provided as required, including insurance details, risk assessments, method statements and agreed safeguarding arrangements. Requirements are confirmed with the site before work begins.

Programme and access

Works can be programmed across holiday windows or, where agreed, around term-time access and occupied buildings. Materials, deliveries and individual phases are coordinated around the school’s requirements.

Quotations and schedules

Scope, quotation and a project schedule are set out before work begins, so site and facilities teams can see what will happen and when.

Communication on site

Day-to-day contact sits with the site and facilities team so the programme stays aligned with the school.

Planned maintenance

Alongside project work, L J Plumbing and Heating Services provides planned plumbing and heating maintenance for schools and education estates.

Company and site information

Gas Safe and OFTEC registration are published on this site. Insurance details, risk assessments, method statements and agreed safeguarding arrangements can be provided as the site requires.

Featured school project

Bishop Loveday Primary School

Bloxham, Oxfordshire. Summer 2025.

Pupil washrooms and the staff toilets, refurbished over the summer break and handed back for the first day of term.

Old basins were replaced with semi-countertop units that conceal pipework and safety valves. Self-closing pillar taps reduce waste. Toilets were upgraded with fast-filling cisterns and dual flush plates. Waterproof wall boards went into the wet areas. Cubicle doors were renewed in a clean, neutral finish. The rooms were redecorated with J Coates Decorating. New flooring was supplied and fitted by Sherfield Flooring. The staff toilets were completed in the same programme, with new sanitaryware, basins and finishes to the same standard as the pupil washrooms.

The works were carefully programmed across the summer holiday, with materials, access and individual phases coordinated around the school’s requirements. The pupil washrooms and the staff toilets were completed and handed back ready for the beginning of the new academic year.

Bishop Loveday Primary School
Pupil washroom basins
Pupil toilet cubicle
Pupil toilet cubicles
Staff toilet
Staff toilet basin and radiator
Staff toilet
Staff toilet basin

School project

Farthinghoe Primary School

Farthinghoe, Northamptonshire. Completed 2026.

A washroom reconfiguration for a village school of around 40 pupils, aged 4 to 11.

This was more than replacing the existing sanitaryware. The space had to work properly for every age group in the school. The former boys’ toilet was decommissioned so the existing girls’ facilities could become a mixed four-cubicle layout. One cubicle was designed as an assisted WC, with grab rails and support arms to improve accessibility. Basins were relocated to give more individual space and fitted with self-closing taps through thermostatic blending valves. Waterproof boxing, dual-flush systems and purpose-made flooring with a sealed upstand were introduced to give a more durable, hygienic finish that is easier for the school to clean and maintain.

The staff WC received the same level of attention, with a new vanity, concealed cistern, flooring and upgraded heating. The work was completed alongside TW Carpentry and J Coates Decorating, with electrical work carried out by JPH.

Farthinghoe Primary School
New mixed cubicles and washbasins at Farthinghoe Primary School
Relocated washbasins with self-closing taps
Pupil washroom looking through to the basin run
Finished cubicle in the mixed four-cubicle layout
Assisted WC with grab rails and support arms
Washroom looking toward the corridor
Basin waste and thermostatic blending valve pipework
Intamix thermostatic blending valve on the hot water supply
Refurbished staff WC with concealed cistern and new vanity
Staff vanity, basin and upgraded heating
Concealed cistern in the staff WC
Farthinghoe School crest

Get in touch

Send the scope and programme.

Need servicing or already a customer of L J Plumbing and Heating Services or SMH? Call the team directly. For residential projects, schools and estate works, use the enquiry form and select the relevant service.

07540 495667

info@ljplumbheat.co.uk

Based in Bodicote

Mon – Fri: 08:00 – 17:00

Your enquiry will be sent directly to the L J Plumbing and Heating Services team.

Planning works across a school or estate?

Send the scope, programme and site requirements. The team will come back with a clear next step.

CallEnquire